Nearing completion now...
A test fit to the control stand.
The flap mechanism and the slider pot and linkage is installed. Now I have to fit and install the stab trim cutout/normal switches and then finish the flap mechanism housing.
I ordered the Beta Innovations Plasma MM2 to interface with. I was going to go with the FDS input modul, but the BI is much less expensive for the same capabilities.
-
11-11-2006, 11:09 PM #2
Impressive, indeed
Thanks for the photos.
-
11-12-2006, 12:41 AM #3
Thank you Matt. It's been a long time coming.
-
11-15-2006, 11:44 PM #4
Just waiting on the electronics now. The card shipped today, so it won't be long now.
I still have a few placquards to mount.