Nearing completion now...
A test fit to the control stand.
The flap mechanism and the slider pot and linkage is installed. Now I have to fit and install the stab trim cutout/normal switches and then finish the flap mechanism housing.
I ordered the Beta Innovations Plasma MM2 to interface with. I was going to go with the FDS input modul, but the BI is much less expensive for the same capabilities.
http://i63.photobucket.com/albums/h1...rottlefit1.jpg
http://i63.photobucket.com/albums/h1...rottlefit2.jpg